Step-by-step guide to carry out a Distributed Renewable Generation (GDR) project in Guatemala according to the NTGDR Technical Standard.
Step-by-step guide to carry out a Distributed Renewable Generation project according to Guatemala’s NTGDR Technical Standard.
The Technical Standard for Distributed Renewable Generation and Self-Producing Users with Energy Surplus (NTGDR) establishes the regulatory framework for the development of distributed generation projects in Guatemala.
This guide details the 5 essential steps that every developer must follow to successfully implement a Distributed Renewable Generation (GDR) project in the country.
The interested party submits the Capacity and Connection Assessment request to the Distributor.
The Distributor reviews the request and prepares the necessary studies.
The CNEE reviews the Assessment and issues the authorization resolution.
The interested party builds the necessary infrastructure under supervision.
Execution of tests and coordination for final connection.
The GDR operates complying with quality standards with automatic disconnection in case of failures.
Sale to Distributors, Wholesale Market, or surplus accreditation in billing.
Responsibility of the GDR with inspections by the Distributor and CNEE.
For maintenance, failures, or non-compliance, coordinated with the Distributor.
Oversight by CNEE with penalties according to the General Electricity Law.
The GDR can sell its energy to:
The implementation of a Distributed Renewable Generation project in Guatemala requires following a structured process and complying with multiple technical and regulatory requirements. Project success depends on careful planning and strict compliance with the NTGDR.
It is essential to have specialized advisory services to navigate this process efficiently and ensure compliance with all current regulations.